1. The aftercooler interface must be a pipe or flange connection. The aftercooler inlet must be connected to the air compressor outlet pipe. It can also be installed in the piping of pneumatic equipment.

2. The aftercooler must be installed on a concrete base.

3. The aftercooler inlet and outlet ports are interchangeable.

4. Before installing and operating any pressure vessel equipment, it must be reported to the local or municipal boiler and pressure vessel safety supervisory authority and registered for use.

5. During operation, the drain valve must be opened regularly to discharge waste, depending on system performance.

6. A control valve must be installed at the aftercooler inlet.

7. Ensure the cooling water inlet temperature and that there are no obstructions in the water pipes.

8. The cooling water must be smooth and free of visible impurities.